"The process of monitoring the status of the project and product scope and managing changes to the scope baseline."
The definition shown above in italics is taken from the Glossary of the Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK® Guide) – Fifth Edition, Project Management Institute Inc., 2013
Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK® Guide) – Fifth Edition, Project Management Institute Inc., 2013 Figure 5-16 Page 136
5.6 Control Scope:
Monitoring Project Scope and controlling changes to the Project Scope Baseline.
The PM takes care to:
Works closely with 4.5 Perform Integrated Change Control
Variance Analysis:
Firebrand Training grants you a personal, non-exclusive, non-transferable license to access and use the site. You may download or print material from the site only for your own personal, non-commercial use. Read our full terms and conditions on https://firebrand.training/no/learn/terms-and-conditions.