Microsoft - Dynamics NAV 2009 Manufacturing

Varighet

Varighet:

Bare 5 dager

Metode

Metode:

klasserommet / på nett / Hybrid

Neste dato

Neste dato:

24/6/2024 (Mandag)

Du lærer deg

Våre akselererte Microsoft Dynamics NAV 2009 Manufacturing kurs- og sertifiseringsprogram tilbyr den raskeste og mest kostnadseffektive måten å oppnå ønsket kunnskap og sertifisering på.

Vi har designet vårt kursmateriell slik at det forbereder deg til eksamen som du gjennomfører underveis på kurset.

Du vil lære deg:

Sample Company Structure

This module gives a detailed overview of the demonstration company (Cronus International Ltd.) and how to use the demonstration data.

After completing this module, students should be able to do the following:

  • Provide an overview of the demonstration company, Cronus International.
  • Set up the date.
  • Change the default profile to Production Planner.

Production Bill of Materials

This module explains the concept and application of bill of materials (BOM). The BOM allows a production planner to determine the type and quantity of components needed to manufacture a specific item. The ability to copy BOM versions and use phantom BOMS, provides greater flexibility in the production process.

After completing this module, students should be able to do the following:

  • Understand the structure of the Production Bill of Materials (BOM).
  • Use the Production BOM Advanced Features.
  • Use Production BOM Reports.

Basic Capacities and Routings

This module examines the setup of capacity in Microsoft Dynamics NAV 2009. The capacity setup can be seen as establishing a model of the production environment.

All the information added in this area is used later when defining routings, as well as when creating capacity journals and reports.

After completing this module, students should be able to do the following:

  • Set up capacity.
  • Establish Routings.
  • Define Routings Advanced Features.
  • Generate reports such as creating a capacity journal or a capacity report.
  • Create Capacity Reports.

Production Orders

This module examines the purpose of the production order in Microsoft Dynamics NAV 2009. Production orders are used to manage the conversion of purchased materials into manufactured items. Production orders (job or work orders) route work through various facilities (work or machine centers) on the shop floor.

After completing this module, students should be able to do the following:

  • Examine the structure and makeup of a production order.
  • Review the purpose of a production order.
  • Define the five statuses of a production order.
  • Create a new production order.
  • View the routing and components of a production order.
  • Reserve components for a production order.
  • Make changes to the production order due date.
  • View actual costs against expected costs and the capacity of a production order.
  • Make changes to the production order quantity required.
  • Make changes to the production order components required.
  • Use item substitution for components.
  • Make changes to the production order routing.
  • Examine the reports printed directly from a production order.
  • Access the Production Schedule from a production order.
  • Review the standard reports available for production order reporting.
  • Review the purpose of the Replan Production Order batch job.
  • Examine how the Replan Production Order batch job operates.
  • Explain the effects of scheduling a production order with a phantom BOM.
  • Calculate a manufacturing batch unit of measure.
  • Identify the two methods of changing the status of a production order.

Production Order Processing

This module examines the production order processing from execution to put away in the warehouse. The first part explains material consumption. This can be done either manually or automatically. The automatic methods are forward and backward flushing.

Next, it explains the pick and put away features used in the warehouse.

Finally, this module discusses the use of the Output Journal to track the hours worked and the materials used in production. There are three methods for recording output.

After completing this module, students should be able to do the following:

  • Issue components using the Consumption Journal.
  • Pick and Put Away items used in manufacturing in Warehouse.
  • Record production order output using the Output Journal.
  • Register consumption and output from a Production Journal.

Finishing Orders and Auto Reporting

This module examines the finishing of production orders in Microsoft Dynamics NAV 2009. This is the last step in the production execution process. After the production order is finished, the flushing of materials is done either automatically or manually. This module explains the forward and backward flushing methods, and discusses their advantages and disadvantages. Finally, the production posting is done either manually or automatically.

After completing this module, students should be able to do the following:

  • Finish Production Orders
  • Conduct Automatic Reporting
  • Be able to record finished production.

System Setup

This module explains the manufacturing setup and production schedule.

After completing this module, students should be able to do the following:

  • Set up the Manufacturing module in Microsoft Dynamics NAV 2009.
  • Set up inventory in relation to Manufacturing.
  • Understand the purpose of a Stockkeeping Unit Card.

Sales Order Interface and Order Planning

This module covers how to use the sales order planning functionality. It also explains how to make changes to sales orders and how the order planning process works from start to finish.

After completing this module, students should be able to do the following:

  • Use the Sales Order Planning Window.
  • Make Changes to Production and Sales Orders.
  • Define the Order Planning process.

Forecast and MPS

This module goes into detail about production forecasting and explains how to net actual demand to forecasts. Additionally, the Planning Approach is explained, and how to forecast for components and sales items. The module also describes how Master Production Scheduling (MPS) provides input to Multi-Resource Planning (MRP) in Microsoft Dynamics NAV 2009.

After completing this module, students should be able to do the following:

  • Explain what the Production Forecast involves.
  • Define Netting Actual Demand and Forecast.
  • Examine the Planning Approach.
  • Explain forecasting sales items and components.
  • Describe how MPS output provides input to MRP.

Planning

This module provides an overview of Planning in Microsoft Dynamics NAV 2009. It explains regenerative planning and net change planning of Material Requirements Planning (MRP). The module also defines the Order tracking and action messaging functionality, which are important parts of MRP planning.

After completing this module, students should be able to do the following:

  • Obtain a general understanding of Planning.
  • Use Regenerative Planning.
  • Use Net Change Planning.
  • Define Order Tracking and Action Messaging.

Additional Planning Topics

This module examines the use of additional planning concepts such as item variants, inventory locations, and transfers between warehouses. It also shows how to use blanket sales orders in planning and how to use multi-level production orders. Finally, it provides an overview of additional planning tools and reports.

After completing this module, students should be able to do the following:

  • Discuss Item Variants
  • Use Locations in Planning
  • Conduct Transfers between Locations
  • Use Blanket Sales Orders in Planning
  • Use Multi-level Production Orders
  • Provide an Overview of Planning Tools
  • Filter the Planning Worksheet
  • Refresh the planning line function
  • Use Planning Reports

Subcontracting

Subcontracting is a strategic decision in many manufacturing companies. Subcontracting is defined as a vendor performing one or more operational steps in the production process. Subcontracting can either be a rare occurrence or an integral part of all production activities, depending on the company.

This module focuses on the different aspects of the subcontracting process from setting up the subcontractor and routing to the daily work routines in the system connected to using the subcontractor.

After completing this module, students should be able to do the following:

  • Set up a Subcontractor.
  • Set up Subcontractor Cost by Subcontractor or by Process.
  • Set up a Routing with a Subcontractor.
  • Process a Production Order with a Subcontractor.
  • Determine when a Purchase Order is related to a Production Order.
  • Determine the status of Subcontractor Operations on Released Production Orders.

Advanced Capacity

Advanced Capacity examines the capacity setup needed to run production planning with constrained resources. Planning with constrained resources is needed when bottlenecks appear in the production environment.

First, the work center group, work center, and machine hierarchy are set up. Then the connected work calendars are defined. Finally, the use of the capacity journals for capacity planning is described in detail. The capacity planning can be seen as the possibility to make a "shop supervisor overview" for the manager responsible for the production.

After completing this module, students should be able to do the following:

  • Define Capacity Resources
  • Set up Work Centers and Machine Center Calendars
  • Use Capacity Journals for Planning

Shop Loading

Shop Loading refers to the daily shop floor operations. It is important when scheduling in a production environment with limited capacity and bottleneck resources.

This chapter provides an overview of how shop loading is carried out in Microsoft Dynamics NAV. It shows how to perform loading of capacities using the traditional work center or machine center load windows, and how to execute finite loading for constrained resources.

After completing this module, students should be able to do the following:

  • Provide an Overview of Shop Loading
  • Perform Loading of Capacities
  • Execute Finite Loading
  • Recognize the Reports Available

Additional Manufacturing Topics

This module contains additional manufacturing topics that are only used in some companies. The first lesson contains a description of the standard task codes feature, which can be used to display additional information on the printed routings on the production floor. Some companies need to report scrap and define planned non-productive operation time; other companies need to reduce lead time by scheduling parallel routings or operate in a multi-level production environment; others again, for example in the pharmaceutical business, need to set up serial and lot numbers to track goods from raw material to end customers.

After completing this module, students should be able to do the following:

  • Use Standard Task Codes
  • Create Stop Codes
  • Create and use Scrap Codes
  • Define BOM Scrap and Routing Scrap
  • Define Non-Productive Time
  • Methods to reduce lead-time
  • Use Multi-Level Manufacturing
  • Use Business Notification
  • List additional features

Her er 8 grunner til hvorfor du skal gjennomføre ditt NAV 2009 Manufacturing hos Firebrand Training:

  1. Du blir utdannet og sertifisert på bare 5 dager. Hos oss får du din utdanning og sertifisering på rekordtid, en sertifisering du også gjennomfører der og da som en integrert del av den intensive, akselererte utdanningen.
  2. Alt er inkludert. Et engangsbeløp dekker alt kursmaterial, eksamen, kost og losji og tilbyr den mest kostnadseffektive måten å gjennomføre ditt NAV 2009 Manufacturing kurs og sertifisering på. Og dette uten noen uannonserte ytterligere kostnader.
  3. Du klarer sertifiseringen første gangen eller kan gå kurset om igjen kostnadsfritt. Det er vår garanti. Vi er sikre på at du vil klare din NAV 2009 Manufacturing sertifisering første gangen. Men skulle du mot formodning ikke gjøre det kan du innen et år komme tilbake og kun betale for eventuelle overnattinger og din eksamen. Alt annet er gratis.
  4. Du lærer deg mer.Tradisjonelle utdanningsdager varer fra kl. 09.00 til 16.00 med lange lunsj- og kaffepauser. Hos Firebrand Training får du minst 12 timers effektiv og fokusert kvalitetsutdanning hver dag sammen med din instruktør, uten private eller arbeidsrelaterte, forstyrrende momenter.
  5. Du lærer deg NAV 2009 Manufacturing raskere. Vi kombinerer de tre innlæringsmetodene (Presentasjon |Øving| Diskusjon) slik at vi gjennomfører kurset på en måte som sikrer at du lærer deg raskere og lettere.
  6. Du er i sikre hender.Vi har utdannet og sertifisert 134.561 personer, vi er partner med alle de store navn i bransjen og vi har vunnet atskillige utmerkelser, bla. a. "Årets Learning Partner 2010, 2011, 2012, 2013 og 2015” fra Microsoft Danmark og med en vekst på 1430 % siden 2009 er vi årets Gazelle prisvinner på Sjælland, Danmark.
  7. Du lærer deg ikke bare teorien. Vi har videreutviklet NAV 2009 Manufacturing kursen og tilbyr flere praktiske øvelser og sikrer på den måten, at du kan bruke dine ferdigheter for å løse daglige praktiske problemstillinger.
  8. Du lærer av de beste. Våre instruktører på NAV 2009 Manufacturing er de beste i bransjen og tilbyr en helt unik blanding av kunnskap, praktisk erfaring og pasjon for å lære bort.

Sertifisering

Sertifiseringsgaranti

Vi er sikre på at du vil klare ditt kurs første gangen. Men skulle du mot formodning ikke gjøre det kan du innen et år komme tilbake og kun betale for eventuelle overnattinger og din eksamen. Alt annet er gratis.

Under kurset forbereder vi deg til, og gjennomfører følgende eksamen:

  • Exam MB7-849: Microsoft Dynamics NAV 2009 Manufacturing

Hva Inngår?

Firebrand Training tilbyr kvalifiserte kurs- og sertifiseringsprogram som inkluderer alt, er enkelt for kunden og er utviklet med fokus på de spesifikke behov som våre deltagere har. Vi sikrer at alle detaljer vil bli tatt hånd om slik at du helt kan fokusere på dine kunnskaps- og sertifiseringsmål.

Våre kurs- og sertifiseringsprogram inkluderer alt med:

  • Praktisk orientert utdanning som bruker vår unike metodikk (Presentasjon |Øving |Diskusjon).
  • Omfattende kursmateriale og laboratoriemanualer – vi utvikler tradisjonelt kursmateriale for å imøtekomme de spesifikke kravene som intensiv læring stiller.
  • Et helt instruktørsstyrt kursprogram med 24 timers tilgang til klasserom, labutstyr og instruktør.
  • Eksamensvoucher og sertifiseringstest som gjennomføres på plass under kurset.
  • Vår sertifiseringsgaranti som betyr at vi tilbyr en uvilkårlig garanti om at du mottar din sertifisering. Du har rett til å gjenta ditt kurs så mange ganger du trenger innen en 12 måneders periode til sertifiseringen er oppnådd. Alt du tenger å betale er eventuelle nye test- og losjigebyrer.
  • Kost og losji, samt tilgang til kaffe, te, frukt og snacks under hele kurset.
  • Transport til og fra nærmeste flyplass/ togstasjon før og etter gjennomført kurs.

Forkunnskaper

Deltagere som med fremgang gjennomfører vårt Microsoft Dynamics NAV 2009 Manufacturing kurs har følgende forkunnskaper:

  • Generell kjennskap til Windows
  • Gjennomført kurset "Introduction in Microsoft Dynamics NAV 2009" eller har tilsvarende kunnskaper
  • Gjennomført kurset "Inventory Control in Microsoft Dynamics NAV 2009" eller har tilsvarende kunnskaper
  • Gjennomført kurset "Manufacturing I in Microsoft Dynamics NAV 2009" eller har tilsvarende kunnskaper
  • En god forståelse av terminologi og prosesser innenfor produksjon

I tillegg er det anbefalt, men ikke nødvendig, at deltakeren har gjennomført kurset "Finance in Microsoft Dynamics NAV 2009".

Er du klar til å bli ferdig utdannet og sertifisert på rekordtid?

Vi intervjuer alle aktuelle deltagere om bakgrunn, utdannelse, sertifisering og deres personlige innstilling. Hvis du kommer igjennom intervjurunden har du svært gode muligheter til å klare sertifiseringen.

Firebrand Training tilbyr et ambisiøst utdanningsmiljø som forutsetter at du virkelig gjør en innsats for å klare kurset. Forkunnskapene som er nevnt ovenfor er kun veiledende, mange deltakere med mindre erfaring, men med annen bakgrunn eller kunnskap, har gjennomført utdannelsen med suksess hos Firebrand Training.

Anmeldelser

Vi har lært opp 134.561 personer på 12 år. Vi ba dem om å anmelde vår akselererte opplæring. Akkurat nå har 96,41% angitt at Firebrand overgikk forventningene:

"The training for PL-100 is an intense course, jam-packed with references, resources delivered by a super knowledgeable instructor. Would recommend having a sound base knowledge of Microsoft Power Platform before attending. MS Learn provides topics for PL-100 and also a study guide for the exam which is very useful when preparing for exam."
Jessica Brooks, Kenvue. (3/1/2024 (Onsdag) til 4/1/2024 (Torsdag))

"Training facilities were great and the hotel onsite is nice."
Anonymous. (18/12/2023 (Mandag) til 20/12/2023 (Onsdag))

"It's the best way to learn without any distraction. Training, eat, sleep, shower."
Anonymous. (13/12/2023 (Onsdag) til 15/12/2023 (Fredag))

"When learning with Firebrand, everything is taken care of for you. This allows you to pour everything into absorbing and understanding your course content amongst peers."
ML, Griggster Limited. (3/10/2023 (Tirsdag) til 6/10/2023 (Fredag))

"Perfect instructor with much knowledge and the ability to bring it to the people. Thank you. The topic is huge but I would have expected a little bit more working together in the system."
Reinhard Decker, VAT Vakuumventile AG. (10/10/2023 (Tirsdag) til 13/10/2023 (Fredag))

Kursdatoer

Start

Slutt

Kapasitet

Plass

Registrer deg

19/2/2024 (Mandag)

23/2/2024 (Fredag)

Ferdig - Gi tilbakemelding

-

 

24/6/2024 (Mandag)

28/6/2024 (Fredag)

Venteliste

Landsdekkende

 

5/8/2024 (Mandag)

9/8/2024 (Fredag)

Begrenset kapasitet

Landsdekkende

 

16/9/2024 (Mandag)

20/9/2024 (Fredag)

Ledige plasser

Landsdekkende

 

28/10/2024 (Mandag)

1/11/2024 (Fredag)

Ledige plasser

Landsdekkende

 

9/12/2024 (Mandag)

13/12/2024 (Fredag)

Ledige plasser

Landsdekkende

 

Siste anmeldelser fra studenten vår